Is my building’s metering ready for the UK Net Zero Carbon Buildings Standard?

Free readiness checker

Is my building’s metering ready for the UK Net Zero Carbon Buildings Standard?

To verify a building against the UK Net Zero Carbon Buildings Standard, you need a full year of measured, in-use energy data, meters in the right places and the evidence to back them up. If you are not sure you have that, our free readiness checker shows you where the gaps are before your Reporting Period End Point arrives.

Free, 24 questions

Version 1, Rev 1
Metering · sub-metering · evidence · landlord and tenant split · fossil fuels
Best for
Building owners, asset managers, sustainability leads, facilities teams and consultants preparing a building to verify.
You get
A readiness score, what is already in place, and a list of gaps with the section of the Standard each one comes from.
Covers
Offices, homes (build to rent and student accommodation), hotels, retail, storage and logistics, schools, higher education, healthcare and mixed-use, new and existing.
Based on
UK Net Zero Carbon Buildings Standard, Version 1, Rev 1 (April 2026).
Measured, not estimated

Operational energy is taken from meter readings over the 12 months ending at your Reporting Period End Point.

Meters in the right places

Mixed-use buildings, car parks and Additional Uses all need sub-metering, and gaps can take a year of data to close.

Evidence ready to submit

Electrical schematics, commissioning reports and the building logbook are what a verifier will ask to see.

What the checker asks

24 questions in five areas.

Each question is tied to the section of the Standard it comes from. There is also an AI assistant you can ask about the Standard, and an energy use intensity limit calculator. You enter your name, company and work email first, then choose your building sector and whether the building is new or existing.
NZ
Free checker

Net Zero Buildings readiness checker

A practical check of whether your metering and evidence are ready to verify.
Building classification
Is the building correctly classed as new or existing, have you identified the sector and the type of works, have you set your Reporting Period End Point, have you confirmed the Date of Commencement that decides your limits, and have you chosen whole building, landlord-only or tenant-only?
Operational energy metering
Do you have meter readings for every grid electricity and gas supply, heat meter readings if you are on a district heating or cooling network, meter readings for any on-site renewables, and the electrical schematic drawings a verifier will ask for?
Sub-metering
If the building is mixed-use, can you measure each sector separately? Are car parks sub-metered? Are any Additional Uses sub-metered so they can be assessed separately? And are data centre areas sub-metered so power usage effectiveness can be calculated?
PC-on-track check
If you are doing the optional check at practical completion, is there evidence that metering and sub-metering has been installed and commissioned, plus the airtightness certificate, heating, cooling and ventilation commissioning reports and the Part L building logbook, all ready to submit within six months?
Landlord and tenant split, and fossil fuels
If you are taking the landlord-only or tenant-only route, are the schematics and sub-metering in place to show who controls what? And have you assessed the fossil fuel free requirement?
How to read your result
You get an overall score with a plain label (ready, gaps to address or at risk), a list of what is in place, and a list of gaps with the section of the Standard each one comes from, plus a short written summary. Metering and sub-metering gaps usually take the longest to close, because they can mean fitting meters and then waiting for a full year of data, so start there.
Open the free checker Free to use. Your result is shown on screen when you finish.

An example (illustrative, not a real client)

Imagine a new building with offices above ground-floor retail, which started on site in 2026. It answers the checker and scores 58%. Grid electricity and gas are metered and the sector is classified correctly. The gaps are that there are no sub-meters separating the retail from the offices, the car park is not sub-metered, and the airtightness certificate has not been requested for the practical completion check. The action list is practical: fit sub-meters to split the two sectors, add one for the car park, and get the airtightness test booked before handover.

What the Standard asks for

According to the UK Net Zero Carbon Buildings Standard, Version 1, Rev 1 (April 2026), operational energy has to be measured, not estimated. Grid electricity and gas are taken from meter readings, district heat from heat meter readings, and on-site renewable generation from meter readings. Bulk fuels such as oil or LPG are based on annual stock measurements and deliveries.
The energy is assessed over the Operational Reporting Period, which is the 12 months ending at the Reporting Period End Point. That end point has to be set at least a year after the building reaches the minimum occupancy rate, which is 80% for buildings meant to be occupied. For buildings that are not intended to be occupied, such as data centres and cold stores, they simply need to be operational.
For mixed-use buildings, sub-meters have to be used so energy can be assessed by sector. Car parks must be sub-metered in new buildings and should be in existing ones, and sub-metered car park energy is left out of the limit check. Some uses listed in the Standard, such as laundry in hotels or community use in schools, can be classed as Additional Uses for up to 30% of the floor area if they are sub-metered, and they are reported separately rather than held to a limit.
The energy use intensity limits depend on the sector, whether the building is new or existing, and the Date of Commencement of the works, and they tighten each year. For a new office that started works in 2026, for example, the limit is 110 kWh per square metre of net internal area, or 88 per square metre of gross internal area. The checker’s calculator covers 2025 to 2030 for new buildings and for existing buildings on the one-go route.
On fossil fuels, they cannot be used on site for in-scope uses except in a short list of allowable cases, including emergency and life safety systems, essential back-up for critical buildings, some scientific processes and construction. Everything that is used still has to be measured and reported.

Verifying against the Standard

To claim conformity, the assessment has to be checked by an independent third party. The Net Zero Carbon Buildings Standard scheme appoints a Verification Administrator, Bureau Veritas, and a building that passes can be described as Net Zero Carbon Aligned. After the first verification the Standard expects annual re-verification for the first three verifications, then every three years if there have been no new, retrofit or reportable works. You can read how the process works on the official verification page.
Common questions

Net Zero Carbon Buildings Standard, answered.

Is the Standard mandatory?

It is an industry standard rather than legislation. What it does require is independent verification before a building can be described as Net Zero Carbon Aligned, and it asks for measured data, not estimates.

Can a landlord verify on their own?

Yes, but only where a tenant is preventing a whole-building assessment, and at the moment only for offices. The landlord has to ask every tenant to take part first and allow at least six weeks for a reply. The landlord-only route also needs a centralised HVAC system serving more than one space or tenancy.

Does a NABERS UK rating count?

For offices, yes, as long as the building reaches the minimum star rating in the Standard and you submit the energy limit that would otherwise have applied. For a new office that started works between 2026 and 2030 that is 5 stars, and for an existing office it is 4.5 stars.

How long do I need data for?

A full 12 months of operational energy data ending at your Reporting Period End Point, which is why it pays to check your metering well before that date.

Want help getting the metering ready?

If the checker shows metering or sub-metering gaps, we can help. Our energy monitoring kit is a quick way to start collecting data from key circuits, and you can talk to us about sub-metering, data collection and getting a building ready to verify. Preparing for other schemes? Try the NABERS UK metering readiness checker, the GRESB energy and water data readiness checker or the ESOS Phase 4 readiness checker.

Find your metering gaps before your end point arrives.

The checker is free and shows you what is in place, what is missing and where to start.
Monitor Hut is not affiliated with the UK Net Zero Carbon Buildings Standard or its verification scheme. This page is general information, not an assessment or a guarantee of verification. Always check the current version of the Standard and speak to an accredited verifier.