If you are heading for a NABERS UK Energy for Offices rating, the metered data is where most of the effort goes. The rating is only as good as the consumption figures behind it, and the rules are specific about what counts. This guide covers what an assessor needs from you, how to ask for it, and where metering quality trips people up.
What data a rating needs
The Metering and Consumption rules apply to base building, whole building and tenancy ratings. In practice that means:
Twelve continuous months. A rating needs at least 12 months of acceptable consumption data, and billing periods should line up with the rating period as closely as possible (the rules allow a maximum two month displacement).
Every energy source and supply point. The assessor has to identify all the energy sources and supply points on site and confirm the minimum energy coverage, so have your site schematics ready.
Utility data first. Utility bills and utility meter data are preferred. Non-utility meters can be used where utility data is incomplete, or where the sub-meter is the more reliable or more direct source.
No estimates. Estimated utility bills are not acceptable as they stand. They have to be corrected, for example with interval data from a remote meter reading system backed by written confirmation from the utility.
How to request the data
Send the request early, because suppliers and managing agents rarely have it to hand. Something like this works:
Subject: Energy data request for a NABERS UK rating at [building]
Hi [name],
We are preparing a NABERS UK Energy for Offices rating for [building, address]. Could you send us the following for the last 12 months, ending [month/year]?
1. Actual (not estimated) electricity, gas and any other fuel bills or meter readings for every supply point, with MPAN/MPRN numbers.
2. Half-hourly or interval data where it exists.
3. A list of any sub-meters, what each one measures, and who installed and calibrated or commissioned it.
4. Any existing meter validation or commissioning certificates, including CT details.
5. Site schematics showing the meter locations.If any month only has an estimated reading, please let us know and we will work out the best way to correct it.
Thanks,
[name]
Metering quality and CT validation
This is the part that catches people out. The rules do not set a single accuracy class, but meters have to read accurately across the load they will actually see, including low loads.
Non-utility meters that use current transformers (CTs), gas meters and remote meter reading systems generally need validation before their data can be used. For CT meters, a licensed electrician or engineer checks the CT ratio, the wiring and the programming. Cloud metering with self-identifying CTs can skip the ratio check, but wireless CTs still need confirming against the right end use. Validation evidence needs to be less than 10 years old and reflect how the system is set up now.
Soft meters and sensors. Readings derived from equipment sensors, such as fan speeds or variable speed drive outputs, can only be used to calculate exclusions, not inclusions. Figures based only on apparent power, or on instantaneous rather than integrated power, are not accepted.
Virtual meters. Meters calculated by adding or subtracting other meters are allowed in some cases, but every underlying physical meter must be validated, and virtual meters cannot be used for certain energy balance checks.
The validation approach has changed over time, so always check the current version of the rules before you commission any validation work.
Who verifies the rating
A licensed NABERS UK assessor is responsible for the accuracy of the data and has to keep the evidence for seven years. Every rating includes a site visit, and the scheme administrator can audit ratings. Assessors are licensed through CIBSE Certification.
A note on who we are: Monitor Hut is not a NABERS UK licensed assessor and does not carry out, certify or submit NABERS UK ratings. NABERS UK ratings are issued through a licensed assessor and CIBSE Certification. This guide is general information about metering and data, and is not affiliated with or endorsed by NABERS UK or CIBSE.
Where Monitor Hut helps
We install and validate sub-metering so the data is ready for an assessor, with CT checks documented and half-hourly data stored in one place. If you want to check how ready your building is, try our NABERS UK interactive guidance tool, or get in touch and we can talk through your metering.
Sources
NABERS UK, The Rules: Metering and Consumption, version 2.0 (March 2023)
CIBSE: NABERS UK
BRE: NABERS UK downloads
This guide is a plain-English summary, not a substitute for the rules. Always work from the current published version and your licensed assessor’s advice.