Is my heat network ready for Ofgem authorisation?

Free compliance checker

Is my heat network ready for Ofgem authorisation?

Heat networks in Great Britain now come under Ofgem’s authorisation conditions, which took effect on 27 January 2026. If you operate or supply heat to consumers, our free checker shows you which conditions apply to your role, what you already have in place and where the gaps are.

At a glance

Free
Best for
Commercial real estate, residential, build to rent and student accommodation owners, housing associations and local authorities that operate or supply heat through a network.
You get
A prioritised list of gaps, each tied to the Ofgem condition it comes from, and a short written summary.
Based on
The Heat Networks (Market Framework) (GB) Regulations 2025 and Ofgem’s authorisation conditions A1 to C2.
Know your role

The conditions differ for operators and suppliers, and many owners are both. The checker starts by working out which applies to you.

Cover every area

Registration, governance, metering and billing, complaints, vulnerable consumers, contracts, pricing, disconnection and continuity.

Start with what matters

Gaps are split into high priority and the rest, so you know where to begin.

What the checker asks

Your role, then the conditions that apply.

You enter your name, organisation and work email, say what kind of organisation you are and whether you operate, supply or both, then tick off what you already have in place. There is a short explanation behind each item.
HN
Free checker

Heat network regulation checker

Scope and role
Does Ofgem’s regime apply to your network, and are you the operator, the supplier or both?
Everyone
Have you registered with Ofgem, set up Standards of Conduct and governance, sorted your heat metering and billing, written a complaints procedure, confirmed your position with the Energy Ombudsman, planned for vulnerable consumers, set fair pricing and prepared for supply interruptions?
Suppliers
Do consumers have written heat supply contracts, is there a deemed contract scheme, do you respect the back-billing limit, are disconnection and payment difficulty procedures in place, and is there a proper process for tariff change notices?
Operators
Do you have a Continuity Plan and the financial resources behind it, and are your material assets properly protected?
How to read your result
You get a plain label for your overall position, a list of what is in place, and a list of gaps. Each gap names the Ofgem condition it relates to, says what is missing and suggests the next step. Gaps that touch registration, metering, billing, contracts and continuity are marked high priority.

What the regime asks for

Ofgem’s authorisation conditions are grouped in three parts. Section A (A1 to A15) applies to every authorised person and covers registration, fair pricing, cost allocation, being fit and proper, providing information to Ofgem, independent audits, material assets, financial responsibility and continuity arrangements. Section B (B1 to B12) applies to suppliers and covers Standards of Conduct, heat supply contracts, contract changes, complaints, billing, back-billing, the Priority Services Register, disconnection and prepayment. Section C (C1 and C2) applies to operators and covers Standards of Conduct and security of supply.
Some of the detail is specific. Heat supply contracts have to be in writing, in plain and intelligible language and set out in a single pack, without terms pulled in by reference to a website. Suppliers have to give at least 31 days of notice of a charge increase or a change that disadvantages the consumer, and charges cannot rise more than once in any six-month period. A deemed contract cannot have a fixed term or a termination fee.
Networks that were already operating are deemed authorised for now, but all heat networks have to register with Ofgem by January 2027. Ofgem’s own pages give 26 and 27 January 2027, so it is safest not to leave it to the last day. New networks after that date will need to apply for authorisation. If you fall short, Ofgem can impose financial penalties and consumer redress orders.
Common questions

Heat network regulation, answered.

Does my building come under the regime?

If you operate a heat network or supply heat to consumers through one, probably. The checker starts with a short scope question so you can find out quickly.

What is the difference between an operator and a supplier?

The operator runs the network and its assets, and the supplier sells the heat to consumers. Different conditions apply to each, and many owners and housing providers are both. Appointing a managing agent does not hand over responsibility for compliance.

Do I need to join the Energy Ombudsman scheme?

The Energy Ombudsman runs the complaint handling and redress scheme for heat network consumers. Check with the Ombudsman and in Ofgem’s guidance what your network needs to do, and make sure your contracts and complaints procedure point consumers to it.

Is this legal advice?

No. It is a practical readiness check. Always read Ofgem’s current guidance and take advice where your arrangements are complicated.

Want help with the metering and data side?

Accurate bills depend on reliable meter data. Monitor Hut installs and manages sub-metering across communal and district heat networks and connects it to our monitoring platform, so you have auditable consumption data behind your billing. You can talk to us about it, or try our other free checkers: UK Net Zero Carbon Buildings Standard, NABERS UK metering, GRESB energy and water data and ESOS Phase 4.

Find your gaps before Ofgem does.

The checker is free and shows you what is in place, what is missing and where to start.
Monitor Hut is not affiliated with Ofgem. This page is general information, not legal advice or a guarantee of compliance. Always check Ofgem’s current guidance.