Live from January 2026

Are you caught by the new
heat network regulations?

The Ofgem authorisation regime is now in force. Answer a few questions to find out if your network is in scope, what role you hold, and where your compliance gaps are.

Heat Networks (Market Framework) Regulations 2025
Energy Act 2023
Ofgem Authorisation Conditions A1–C2
Monitor Hut

Heat Network
Regulation Checker

Tell us a little about yourself and we'll run you through the scope check and compliance assessment — results are generated immediately.

We may follow up based on what you've shared. We don't share your information.

1
Scope
2
Your Role
3
Compliance
4
Results
Step 1 of 4 — Scope Check

Do you operate or manage a heat network?

A heat network supplies heating, cooling, or hot water from a central source through shared pipework to multiple units or buildings. This includes communal boiler systems in residential or commercial buildings, district heating schemes, and shared ground loops.

Scope Assessment

Your network is likely not in scope

Based on your answers, the Ofgem heat network authorisation regime does not appear to apply to your situation.

Why you're exempt

Worth noting: The Heat Network (Metering and Billing) Regulations 2014 may still apply in some circumstances. If your situation changes — for example, you bring in external tenants or expand the network — you should reassess. If you're unsure, speak to Monitor Hut.
Step 2 of 4 — Your Role

What type of organisation are you?

This helps us apply the right authorisation conditions. Different obligations apply depending on your sector and how the network is structured.

What is your role in relation to the heat network?

You may hold one or both regulated roles. The supplier bills end consumers; the operator controls and maintains the network.

Step 3 of 4 — Compliance Assessment

Where do you stand today?

Select all that apply. Be honest — this gives you the most useful output.

All operators and suppliers (Conditions A1–A15)
Ofgem opened its registration portal for heat network operators and suppliers in spring 2026. Every organisation caught by the regime must register — it's the primary gateway to authorisation. You'll need basic details about the network, its size, and your role. Registration is free. If you haven't done this yet it should be your first action.
Ofgem requires you to have a written policy committing to five core consumer principles: being honest and transparent, treating consumers fairly, providing accurate information, maintaining competency, and handling consumer data responsibly. You also need to document who in your organisation is responsible for heat network compliance. For most asset managers this means a short policy document and a named contact — it doesn't need to be complex.
Each separately occupied unit — flat, office, retail unit — must have its own heat meter measuring actual consumption. A single meter for the whole building with costs divided by floor area is no longer compliant. Heat Cost Allocators (HCAs), which were sometimes used as an alternative, are not accepted under the new regime in Great Britain. Meters must be MID-certified (EU Measuring Instruments Directive standard) and accessible for reading.
Bills must show actual consumption from meter readings as the default — not estimates or apportionments. They must also include a specific set of information: the tariff breakdown, unit rate, standing charge, the period covered, meter reading used, comparison to prior period, and contact details for queries. Estimated billing is only permitted in limited defined circumstances, such as when a meter is inaccessible for reading.
You must have a written complaints procedure that acknowledges complaints within a set timeframe, works to resolve them, and — if unresolved after eight weeks — tells the consumer they can escalate to the Energy Ombudsman. The procedure must be easy to find and written in plain English. The Energy Ombudsman publishes a model procedure you can adapt. Tick this if your procedure is documented, live, and includes the Ombudsman escalation step.
The Energy Ombudsman is the independent body that handles escalated complaints from heat network consumers. Registration is mandatory for all authorised persons — it's separate from having a complaints procedure in place. You need to have actively signed up with the Ombudsman scheme itself. There is an annual fee based on network size. Visit energyombudsman.org to register.
You must have a written policy explaining how you identify consumers who may be vulnerable — due to age, disability, illness, or financial difficulty — and what additional support you provide them. You also need to maintain a Priority Services Register (PSR): a list of vulnerable consumers who have opted in to receive extra support such as advance notice of outages or large-print bills. For social housing operators this overlaps with existing housing management obligations but must be specifically applied to the heat network context.
Because heat network consumers cannot switch supplier, Ofgem requires you to demonstrate that your tariffs are genuinely cost-reflective — meaning they cover your actual costs of generation, distribution, and administration, but are not excessive or profit-inflated beyond what a competitive market would produce. You need a written policy setting out your pricing methodology. Accurate consumption data from metering is essential to underpin this — you can't demonstrate cost-reflective billing without reliable metering records.
For planned outages (maintenance, upgrades) you must notify consumers in advance — the required notice period depends on the duration of the interruption. For unplanned outages (equipment failure, emergency) you must have a documented process for rapid response, consumer notification, and restoration timescales. Both procedures must be written down and actually followed. Remote monitoring tools that alert you to supply events in real time significantly help with the unplanned interruption obligation.